Skip to content

Localize readable long dates and the next billing date - #105869

Merged
roryabraham merged 7 commits into
Expensify:mainfrom
shubham1206agra:localize-dates-long-date-local
Nov 10, 2026
Merged

roryabraham merged 7 commits into
Expensify:mainfrom
shubham1206agra:localize-dates-long-date-local

Conversation

@shubham1206agra

@shubham1206agra shubham1206agra commented Nov 4, 2026 •

Copy link
Copy Markdown
Contributor

Explanation of Change

DateUtils.formatToReadableString and the subscription's next billing date formatted local dates with the hand-written date-fns pattern MMMM d, yyyy. The pattern fixes the US component order, so other languages showed their own month name in an English shape, for example Juni 20, 2026 in German.

This adds DateUtils.formatToLongDate, which formats a date's local calendar fields with a cached Intl.DateTimeFormat in the app's selected language. formatToReadableString now uses it, and so does getNextBillingDate:

Language Before After
English June 20, 2026 June 20, 2026 (unchanged)
German Juni 20, 2026 20. Juni 2026
Spanish junio 20, 2026 20 de junio de 2026
Japanese 6月 20, 2026 2026年6月20日

formatToReadableString is used for:

  • Search date filter summaries (On, After, Before) and day group headings
  • Distance rate start and end dates on the rate details page
  • Custom unit rate date ranges in workspace history messages
  • A card date in CardUtils

An invalid date now returns an empty string instead of throwing.

This is one of a set of small, independent PRs that split up the date-localization work in #105846. They can merge in any order. Each one caches its own Intl.DateTimeFormat next to the function it changes; a follow-up will merge those into one shared helper.

Fixed Issues

$ #98088
PROPOSAL:

Tests

  1. Open Settings > Preferences > Language and select Deutsch.
  2. Open Reports, add a Date filter set to "On" a specific day, and verify the filter summary shows the date in German order, for example 20. Juni 2026.
  3. Open a workspace's distance rates, open a rate with a start date, and verify the start date uses the German order.
  4. Open Settings > Subscription on a plan without a fixed end date and verify the next billing date uses the German order.
  5. Switch back to English and verify all of the above read June 20, 2026, the same as before.
  • Verify that no errors appear in the JS console

Offline tests

Same as tests.

QA Steps

Same as tests.

PR Author Checklist

  • I linked the correct issue in the ### Fixed Issues section above
  • I wrote clear testing steps that cover the changes made in this PR
    • I added steps for local testing in the Tests section
    • I added steps for the expected offline behavior in the Offline steps section
    • I added steps for Staging and/or Production testing in the QA steps section
    • I added steps to cover failure scenarios (i.e. verify an input displays the correct error message if the entered data is not correct)
    • I turned off my network connection and tested it while offline to ensure it matches the expected behavior (i.e. verify the default avatar icon is displayed if app is offline)
    • I tested this PR with a High Traffic account against the staging or production API to ensure there are no regressions (e.g. long loading states that impact usability).
  • I included screenshots or videos for tests on all platforms
  • I ran the tests on all platforms & verified they passed on:
    • Android: Native
    • Android: mWeb Chrome
    • iOS: Native
    • iOS: mWeb Safari
    • MacOS: Chrome / Safari
  • I verified there are no console errors (if there's a console error not related to the PR, report it or open an issue for it to be fixed)
  • I verified any copy / text that was added to the app is either coming verbatim from figma or has been approved by marketing (in order to get marketing approval, ask the Bug Zero team member to add the Waiting for copy label to the issue)
  • If a new code pattern is added I verified it was agreed to be used by multiple Expensify engineers
  • I tested other components that can be impacted by my changes (i.e. if the PR modifies a shared library or component like Avatar, I verified the components using Avatar are working as expected)
  • If new assets were added or existing ones were modified, I verified that:
    • The assets are optimized and compressed (for SVG files, run npm run compress-svg)
    • The assets load correctly across all supported platforms.
  • If the PR modifies code that runs when editing or sending messages, I tested and verified there is no unexpected behavior for all supported markdown - URLs, single line code, code blocks, quotes, headings, bold, strikethrough, and italic.
  • If the PR modifies a generic component, I tested and verified that those changes do not break usages of that component in the rest of the App (i.e. if a shared library or component like Avatar is modified, I verified that Avatar is working as expected in all cases)
  • If the PR modifies a component related to any of the existing Storybook stories, I tested and verified all stories for that component are still working as expected.
  • If the PR modifies a component or page that can be accessed by a direct deeplink, I verified that the code functions as expected when the deeplink is used - from a logged in and logged out account.
  • If the PR modifies the UI (e.g. new buttons, new UI components, changing the padding/spacing/sizing, moving components, etc) or modifies the form input styles:
    • I verified that all the inputs inside a form are aligned with each other.
    • I added Design label and/or tagged @Expensify/design so the design team can review the changes.
  • If the PR adds or modifies the UI:
    • I asked an AI agent to review the changes for accessibility issues and addressed its findings.
    • I tested with a screen reader (VoiceOver on macOS) and verified all new/changed elements are reachable with a logical focus order.
    • I verified all new/changed elements have meaningful accessible names and roles.
    • I verified state changes are announced (e.g. checked/unchecked, expanded/collapsed, selected).
  • I added unit tests for any new feature or bug fix in this PR to help automatically prevent regressions in this user flow.
  • If the main branch was merged into this PR after a review, I tested again and verified the outcome was still expected according to the Test steps.

Screenshots/Videos

Screen.Recording.2026-11-08.at.9.56.46.AM.mov

Add DateUtils.formatToLongDate, which formats a date's local calendar fields
with a cached Intl.DateTimeFormat, and use it in formatToReadableString and
getNextBillingDate. Other languages get their own component order; English
output is unchanged, and an invalid date now returns an empty string.
@shubham1206agra
shubham1206agra marked this pull request as ready for review November 8, 2026 04:29
@shubham1206agra
shubham1206agra requested review from a team as code owners November 8, 2026 04:29
@melvin-bot
melvin-bot Bot requested review from dylanexpensify and linhvovan29546 and removed request for a team and dylanexpensify November 8, 2026 04:29
@melvin-bot

melvin-bot Bot commented Nov 8, 2026

Copy link
Copy Markdown

@linhvovan29546 Please copy/paste the Reviewer Checklist from here into a new comment on this PR and complete it. If you have the K2 extension, you can simply click: [this button]

@chatgpt-codex-connector

chatgpt-codex-connector Bot commented Nov 8, 2026 •

Copy link
Copy Markdown
Codex Review Summary: ✅ Completed

This comment shows the latest Codex review activity on this pull request.

Review Status Commit Review trigger
📝 Code Review ✅ Completed 2026-11-08T04:43:17.006734Z e48e6f8 Draft marked ready
ℹ️ About Codex in GitHub

Your team has set up Codex to review pull requests in this repo. Reviews are triggered when you

  • Open a pull request for review
  • Mark a draft as ready
  • Comment "@codex review" or "@codex security review".

Codex reacts with 👀 while any review is running, comments if it has suggestions, and reacts with 👍 once all reviews finish with no findings.

@linhvovan29546

linhvovan29546 commented Nov 10, 2026 •

Copy link
Copy Markdown
Contributor

Reviewer Checklist

  • I have verified the author checklist is complete (all boxes are checked off).
  • I verified the correct issue is linked in the ### Fixed Issues section above
  • I verified testing steps are clear and they cover the changes made in this PR
    • I verified the steps for local testing are in the Tests section
    • I verified the steps for Staging and/or Production testing are in the QA steps section
    • I verified the steps cover any possible failure scenarios (i.e. verify an input displays the correct error message if the entered data is not correct)
    • I turned off my network connection and tested it while offline to ensure it matches the expected behavior (i.e. verify the default avatar icon is displayed if app is offline)
  • I checked that screenshots or videos are included for tests on all platforms
  • I included screenshots or videos for tests on all platforms
  • I verified that the composer does not automatically focus or open the keyboard on mobile unless explicitly intended. This includes checking that returning the app from the background does not unexpectedly open the keyboard.
  • I verified tests pass on all platforms & I tested again on:
    • Android: HybridApp
    • Android: mWeb Chrome
    • iOS: HybridApp
    • iOS: mWeb Safari
    • MacOS: Chrome / Safari
  • If there are any errors in the console that are unrelated to this PR, I either fixed them (preferred) or linked to where I reported them in Slack
  • I verified any copy / text that was added to the app is either coming verbatim from figma or has been approved by marketing (in order to get marketing approval, ask the Bug Zero team member to add the Waiting for copy label to the issue)
  • If a new code pattern is added I verified it was agreed to be used by multiple Expensify engineers
  • I verified other components that can be impacted by these changes have been tested, and I retested again (i.e. if the PR modifies a shared library or component like Avatar, I verified the components using Avatar have been tested & I retested again)
  • If a new component is created I verified that:
    • A similar component doesn't exist in the codebase
    • All props are defined accurately
    • The component has a clear name that is non-ambiguous and the purpose of the component can be inferred from the name alone
    • The only data being stored in the state is data necessary for rendering and nothing else
    • The component has the minimum amount of code necessary for its purpose, and it is broken down into smaller components in order to separate concerns and functions
  • If the PR modifies code that runs when editing or sending messages, I tested and verified there is no unexpected behavior for all supported markdown - URLs, single line code, code blocks, quotes, headings, bold, strikethrough, and italic.
  • If the PR modifies a generic component, I tested and verified that those changes do not break usages of that component in the rest of the App (i.e. if a shared library or component like Avatar is modified, I verified that Avatar is working as expected in all cases)
  • If the PR modifies a component related to any of the existing Storybook stories, I tested and verified all stories for that component are still working as expected.
  • If the PR modifies a component or page that can be accessed by a direct deeplink, I verified that the code functions as expected when the deeplink is used - from a logged in and logged out account.
  • If the PR modifies the UI (e.g. new buttons, new UI components, changing the padding/spacing/sizing, moving components, etc) or modifies the form input styles:
    • I verified that all the inputs inside a form are aligned with each other.
    • I added Design label and/or tagged @Expensify/design so the design team can review the changes.
  • If the PR adds or modifies the UI:
    • I asked an AI agent to review the changes for accessibility issues and addressed its findings.
    • I tested with a screen reader (VoiceOver on macOS) and verified all new/changed elements are reachable with a logical focus order.
    • I verified all new/changed elements have meaningful accessible names and roles.
    • I verified state changes are announced (e.g. checked/unchecked, expanded/collapsed, selected).
  • For any bug fix or new feature in this PR, I verified that sufficient unit tests are included to prevent regressions in this flow.
  • If the main branch was merged into this PR after a review, I tested again and verified the outcome was still expected according to the Test steps.
  • I have checked off every checkbox in the PR reviewer checklist, including those that don't apply to this PR.

Screenshots/Videos

Android: HybridApp Image
Android: mWeb Chrome
iOS: HybridApp
Screen.Recording.2026-11-10.at.09.59.21.mov
iOS: mWeb Safari
MacOS: Chrome / Safari
Screen.Recording.2026-11-10.at.09.56.15.mov

@linhvovan29546 linhvovan29546 left a comment

Copy link
Copy Markdown
Contributor

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

Conflicts

@shubham1206agra

Copy link
Copy Markdown
Contributor Author

@linhvovan29546 Resolved

@roryabraham
roryabraham merged commit 9562257 into Expensify:main Nov 10, 2026
36 of 37 checks passed
@github-actions

Copy link
Copy Markdown
Contributor

🚧 roryabraham has triggered a test Expensify/App build. You can view the workflow run here.

@OSBotify

Copy link
Copy Markdown
Contributor

✋ This PR was not deployed to staging yet because QA is ongoing. It will be automatically deployed to staging after the next production release.

@github-actions

Copy link
Copy Markdown
Contributor

@OSBotify

Copy link
Copy Markdown
Contributor

🚀 Deployed to staging by https://github.com/roryabraham in version: 9.5.36-0 🚀

platform result
🕸 web 🕸 success ✅
🤖 android 🤖 success ✅
🍎 iOS 🍎 success ✅

@MelvinBot

Copy link
Copy Markdown
Contributor

No FullStory changes needed — this PR only fixes date localization and invalid-date handling in existing UI, without adding new screens, interactions, user properties, or sensitive content.


view run

@MelvinBot

Copy link
Copy Markdown
Contributor

No help site update needed — this fixes date formatting to match the selected language as users would expect, without adding a workflow or making any existing article factually incorrect.


view run

@OSBotify

Copy link
Copy Markdown
Contributor

🚀 Deployed to production by https://github.com/yuwenmemon in version: 9.5.36-0 🚀

platform result
🕸 web 🕸 success ✅
🤖 android 🤖 success ✅
🍎 iOS 🍎 success ✅

Bundle Size Analysis (Sentry):

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

5 participants