Skip to content

jvm-tests job timeout (15min) too tight for Run Lint after AGP 8.13/Gradle 8.13 bump #679

Closed

Description

@libravault-xyz

.github/workflows/jvm-tests.yml's Unit & Integration Tests (JVM) job has timeout-minutes: 15, with Run Lint as its last step. On PR #672 (the AGP 8.9.1->8.13.2 / Gradle 8.11.1->8.13 bump for issue #582), Run JVM tests alone took ~12m38s — likely a one-time cold-cache tax from the new Gradle wrapper distribution missing gradle/actions/setup-gradle's cache key, plus AGP invalidating cached lint models. That left Run Lint only ~40s before the job-level timeout killed it mid-lintAnalyzeDebug, 3 modules into ~20.

Not a hang — steadily progressing when killed, consistent with cache-cold rather than a real regression. Should self-resolve once dev's cache is warm again post-merge, but bumping timeout-minutes gives real headroom either way and is low-risk.

Fix applied directly on PR #672 (blocks its own required check): timeout-minutes: 15 -> 25.

If this recurs on dev after the cache should be warm again, worth a closer look at whether Lint itself got slower under AGP 8.13, not just cache-cold.

Activity

  1. added
    status:ready-for-dev
    on Aug 26, 2026
  2. added
    status:in-progress
    on Aug 26, 2026
  3. libravault-xyz commented on Aug 26, 2026

    @libravault-xyz
    CollaboratorAuthor

    Fixed via PR #672 (merged) — bumped jvm-tests job timeout 15min->25min. Confirmed: the final CI run passed Unit & Integration Tests (JVM) clean in 16m47s (within the new budget), consistent with the cache-cold theory.

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

No one assigned

    Labels

    status:in-progressstatus:ready-for-dev

    Type

    No type

    Projects

    No projects

      Milestone

      No milestone

      Relationships

      None yet

      Development

      No branches or pull requests

      Issue actions