Repository navigation
docs(connectors): Google Calendar stays hidden until an enrolled call and an owner walk - #4020
Conversation
… and an owner walk The readiness row still said the Calendar flag was off. #3341 turned the credentials back on in values-dev on 11-03 and kept the tile out through hiddenEntries. The row now says so, and records the 11-12 decision: the tile stays hidden until the dev project's Developer Preview enrollment is confirmed by a successful list_calendars call (the 10-09 failure mode), and a walk on a team test account passes, whose calendar consent is the owner's to click. Google's OAuth verification gates it beyond test users. Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com> Claude-Session: https://claude.ai/code/session_01MDs9DQa5PPyZMp9466AhTE
|
Warning Review limit reachedYou've used all free OSS reviews for now. Wait for the free limit to reset to keep reviewing this public repository. Next included review available in 8 minutes. View limit details
Thanks for using CodeRabbit! It's free for OSS, and your support helps us grow. If you like it, consider giving us a shout-out. |
…ount consent ruling, not clicked by the owner (review) Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com> Claude-Session: https://claude.ai/code/session_01MDs9DQa5PPyZMp9466AhTE
lilyshen0722
left a comment
There was a problem hiding this comment.
One review round (Haiku subagent, read-only). It checked every factual claim in the row against the repo:
- values-dev:
googleCalendar.enabled: true, andgoogle-calendaris inhiddenEntries. googleCalendarDevCredentials.test.jspins both.- #2066 e370fe9 (10-01), #2111 (10-09), #2137 (10-14, flag off), #3341 (11-03, flag on plus hiddenEntries) and #3359 (11-09) match their diffs and dates.
- 5 read tools and 3 read scopes plus
openid. - Same column count as the neighbouring rows; no infra identifiers.
All OK.
It flagged one process clause: that the consent walk was "the owner's to click". The 11-03 test-account consent ruling contradicts that. Fixed at b931d0b: the walk is run by a session that holds the owner's consent ruling for team test accounts.
GATE: PASS
The integration readiness row for Google Calendar was stale. It said
hostedMcp.googleCalendar.enabledwasfalseon dev, but #3341 (11-03) turned the credentials back on and keeps the tile hidden throughhostedMcp.hiddenEntries. That is pinned bybackend/__tests__/unit/helm/googleCalendarDevCredentials.test.js.The row now records that state and a decision made on 11-12: the tile stays hidden until both of these hold.
list_calendarscall succeeds. On 10-09 OAuth worked but every tool call failed this per-project gate.The change that records the walk also removes
google-calendarfromhiddenEntries. Google's OAuth app verification of the read scopes (which #3359 prepared the privacy policy for) gates offering it beyond test users.This is docs only, with no change to code or config.
🤖 Generated with Claude Code
https://claude.ai/code/session_01MDs9DQa5PPyZMp9466AhTE