One issue takes days to deliver. Today's change workflow adds process steps and shared files that conflict and wait, beyond what industry practice for a small team with agents needs.

Evidence (2026-10-20, v0.2.38)

Questions

  1. Should every change be one issue delivered by one pull request? This retires "Part of #N" (fix(github): a pull request that delivers part of an item says Part of #N and passes readiness #1617) and splits large items into sub-issues (GitHub sub-issues) instead.
  2. Which records stay in the repository?
    • Task files, or the pull request description plus the issue? Is an ADR the one in-repo record for decisions?
    • Changelog fragments, or entries generated from Conventional Commit titles?
  3. Measure where an item's elapsed time goes, for the items of v0.2.36-v0.2.38:
    • start to first pull request, then pull request to merge;
    • time in the pre-push gate, in CI, in review rounds, in rebases, and waiting for the owner.
      Which steps would industry practice drop or move?
  4. What does each change cost to make: the code, tests, readiness checks (devops pr check-readiness), tests/test_agent_task_files.py, AGENTS.md, CONTRIBUTING.md and the release cut's fragment collection?

Deliverable

An ADR recording the decision, with the measurements behind it, and one follow-up issue per change it decides, each delivered by one pull request.

Acceptance criteria

  • The lead-time breakdown for at least 20 delivered items is recorded with its method.
  • The ADR decides questions 1 and 2, and cites the industry practice it follows.
  • Follow-up issues are filed for each change, in delivery order.

regression of #1617, shipped in v0.2.37

Activity

  1. added
    source/agent
    type/docs
    on Oct 20, 2026
  2. dan-petty commented on Oct 20, 2026

    @dan-petty
    OwnerAuthor

    Intake placed this item to the backlog: at intake only a critical fix goes into a release; a release start pulls Ready items in, P0 features first.

    • Type: type/docs. The title includes 'docs(adr): decide one pull request per issue' and the body discusses ADRs and documentation decisions.
    • Priority: P2-Medium. This item addresses workflow process improvements that affect team productivity but does not block critical functionality or introduce bugs.
    • Value: Medium. Improves developer experience and project clarity by standardizing how changes are tracked, but doesn't directly impact end users or core features.
    • Effort: High. Requires significant coordination across the team to implement new processes and update documentation, plus follow-up issues for each change.
  3. dan-petty commented on Oct 23, 2026

    @dan-petty
    OwnerAuthor

    Decided by ADR 0012 and ADR 0013 and delivered by #1952: one pull request closes one issue, Part of #N is retired, and the changelog comes from the Conventional Commit titles. The lead-time breakdown of 20 items was not recorded; the process it would measure is deleted. Reopen if you still want the figures.

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

No one assigned

    Labels

    source/agenttype/docs

    Type

    No type

    Projects

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions