Skip to content

Rollout 2023-08-09 #2811

Closed
Closed

Description

@MilenaHristova

Purpose

This issue tracks the arcade-services repository rollout. On top of the Rollout instructions described on the wiki, it provides the person responsible for the rollout checklist of the steps that need to be performed to rollout services in this repository. All relevant information, including the rollout PR, issues encountered during the rollout and steps taken to resolve them should be linked or added to this issue to keep full audit trail of changes rolled out to production.

Process

Build status check (Monday)

Rollout preparation (Tuesday)

  • Check the vendor prepared the rollout:
  • In case there is a problem with the CI build, notify the Rollout channel
  • Link the rollout PR to the Rollout PRs section of this issue
  • Double-check that the release notes contain all information
  • Merge the already prepared rollout PR
  • Link the rollout build to the Rollout build section of this issue
  • Verify that Maestro opened a production => main PR in arcade-services with the rollout merge commit (example). The commit in question should be empty. Do not merge the PR yet
  • Ensure the build is green and stops at the "Approval" phase

Rollout day (Wednesday)

  • Approve the Approval stage of the rollout build (that has been already started the day before)
  • Monitor the rollout build for failures.
  • Keep track of any issues encountered during the rollout either directly in this issue, or in a dedicated issue linked to this issue
  • Update the rollout stats in the Stats section below. The statistics will be available in Kusto a few minutes after the build was finished
  • Notify the Rollout channel
  • Merge the production => main Maestro PR in arcade-services
  • Move rolled-out issues in the Rollout column of the Product Construction board into Done. Add a link in to this rollout issue in the comments before closing them (example)
  • Close this issue with closing comment describing a high-level summary of issues encountered during the rollout

Rollout data

Rollout PRs

Rollout build

Rollout times

Use the following Kusto query to gather data about rollout times:

  • Pre-Approval run time: 00:35
  • Post-Approval run time: 01:11

Useful links

Activity

  1. oleksandr-didyk commented on Aug 9, 2023

    @oleksandr-didyk
    Contributor

    Rollout successful, no issues encountered

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Labels

Type

No type

Projects

No projects

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions