Skip to content

chore(ci): pin cicd-workflows references - #34

Merged
AlexanderLanin merged 1 commit into
mainfrom
chore/pin-cicd-workflows
Sep 15, 2026
Merged

AlexanderLanin merged 1 commit into
mainfrom
chore/pin-cicd-workflows

Conversation

@AlexanderLanin

Copy link
Copy Markdown
Member

Why

The documentation cleanup workflow currently follows the moving @main branch. eclipse-score/cicd-workflows#224 removes that standalone workflow file, so leaving the reference on @main would make the scheduled cleanup stop resolving when that cleanup lands. Pinning preserves the current CI behavior while keeping workflow migration out of scope.

What changed

  • Pinned docs-cleanup.yml to 37eaadadfefc263d94a858d25665735659e916fa.
  • Kept the existing GITHUB_TOKEN secret forwarding unchanged.

This is intentionally a pin-only change; migration to daily.yml can be handled separately.

@github-actions

github-actions Bot commented Sep 15, 2026 •

Copy link
Copy Markdown

License Check Results

🚀 The license check job ran with the Bazel command:

bazel run --lockfile_mode=error //:license-check

Status: ⚠️ Needs Review

Click to expand output
[License Check Output]
Extracting Bazel installation...
Starting local Bazel server (8.6.0) and connecting to it...
INFO: Invocation ID: 9c368647-fd70-45ad-9c7e-f35f77a1a1fb
Computing main repo mapping: 
Loading: 
Loading: 0 packages loaded
Loading: 0 packages loaded
    currently loading: 
Loading: 0 packages loaded
    currently loading: 
Analyzing: target //:license-check (1 packages loaded, 0 targets configured)
Analyzing: target //:license-check (1 packages loaded, 0 targets configured)

Analyzing: target //:license-check (31 packages loaded, 14 targets configured)

Analyzing: target //:license-check (92 packages loaded, 14 targets configured)

Analyzing: target //:license-check (92 packages loaded, 14 targets configured)

Analyzing: target //:license-check (162 packages loaded, 6365 targets configured)

Analyzing: target //:license-check (169 packages loaded, 9541 targets configured)

Analyzing: target //:license-check (170 packages loaded, 9665 targets configured)

INFO: Analyzed target //:license-check (175 packages loaded, 15774 targets configured).
[1 / 1] no actions running
INFO: From Generating Dash formatted dependency file ...:
INFO: Successfully converted 2 packages from Cargo.lock to bazel-out/k8-fastbuild/bin/formatted.txt
[14 / 16] [Prepa] JavaToolchainCompileBootClasspath external/rules_java+/toolchains/platformclasspath.jar
INFO: Found 1 target...
Target //:license.check.license_check up-to-date:
  bazel-bin/license.check.license_check
  bazel-bin/license.check.license_check.jar
INFO: Elapsed time: 35.927s, Critical Path: 1.80s
INFO: 16 processes: 12 internal, 3 processwrapper-sandbox, 1 worker.
INFO: Build completed successfully, 16 total actions
INFO: Running command line: bazel-bin/license.check.license_check ./formatted.txt <args omitted>
usage: org.eclipse.dash.licenses.cli.Main [-batch <int>] [-cd <url>]
       [-confidence <int>] [-ef <url>] [-excludeSources <sources>] [-help] [-lic
       <url>] [-project <shortname>] [-repo <url>] [-review] [-summary <file>]
       [-timeout <seconds>] [-token <token>]

@AlexanderLanin
AlexanderLanin merged commit 969e1ef into main Sep 15, 2026
7 checks passed
@AlexanderLanin
AlexanderLanin deleted the chore/pin-cicd-workflows branch September 15, 2026 12:00
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

2 participants