Left side of V-Model done.

Acceptance Criteria:

  • Process & Tooling for requirements & architecture is available (sphinx-needs incl. additional checks for verifying traceability/consistency).
  • Process & Tooling for Detailed design, implementation & unit verification defined and implemented (e.g. spinx-test-reports).
  • CI/CD is capable to automatically verify the consistency & traceability.
  • Tooling for test coverage & static code analysis.

Prerequisites:

  • Selection of tooling (e.g. static code analysis).

Activity

  1. 15 remaining items

  2. removed this from the milestone on Nov 20, 2025
  3. dcalavrezo-qorix commented on Nov 27, 2025

    @dcalavrezo-qorix
    Contributor

    Hi @johannes-esr,

    Is this issue still relevant? If not, please add the trash label so it can be marked for deletion.

  4. anmittag commented on Jan 30, 2026

    @anmittag
    Member

    all subs are closed => close

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

No one assigned

    Projects

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions