Phase: β — Schuster demo · Plan task: β.6 · Est: 1 pd · Suggested role: Dev A + Schuster relationship owner
What to build
Rehearse the full demo on a fresh machine; time the runbook; pre-bake a known-good run-dir the inspector can replay if the live solve or LLM creds fail on-site (Q129/Q130 mitigation).
Acceptance criteria
Blocked by: #4, #5
Authoritative refs: plan §2 β.6 · PRD S1/S4/S5
Phase: β — Schuster demo · Plan task: β.6 · Est: 1 pd · Suggested role: Dev A + Schuster relationship owner
What to build
Rehearse the full demo on a fresh machine; time the runbook; pre-bake a known-good run-dir the inspector can replay if the live solve or LLM creds fail on-site (Q129/Q130 mitigation).
Acceptance criteria
Blocked by: #4, #5
Authoritative refs: plan §2 β.6 · PRD S1/S4/S5