You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
{{ message }}
Repository navigation
Roll out pr-issue-linkage caller to all requires-ci repos #121
Deferred out of #118 ("Deliberately not done here ... rolling out per-repo callers (up to 9 requires-ci repos)").
#118 lands the pr-issue-linkage.yml reusable workflow itself, generalized from melodic-software/provisioning's repo-specific pr-body.yml. This issue tracks rolling out the canonical caller to every requires-ci repo, pinned to #118's merge-commit SHA.
Scope
Add the caller block to all 9 requires-ci repos (same set as the do-not-merge-gate rollout, see #120):
.github
ci-runner
ci-workflows (dogfood)
claude-code-plugins
github-iac
medley
standards
dotfiles
provisioning — note: provisioning's own pr-body.yml predates this shared workflow and isn't required to switch; it can adopt the shared caller opportunistically or keep its own implementation.
Blocked on
#118 merging (need its merge-commit SHA to pin every caller to).
Downstream
Once all applicable callers are merged and emitting the pr-issue-linkage / pr-issue-linkage check green, wiring the required-status-check into github-iac's ci-gate ruleset can proceed — tracked separately in melodic-software/github-iac, since ruleset/settings changes live there.
Verified live on 2026-07-21: all eight applicable requires-ci repositories have the SHA-pinned shared PR-linkage caller on their default branch and each has emitted a successful pr-issue-linkage / pr-issue-linkage check. Pins are PR #118’s merge SHA (f7e94a802...) or immutable forward descendants. Provisioning retains its explicitly permitted local .github/workflows/pr-body.yml implementation and has emitted a successful local pr-body check. Trigger, check-name, and selector/fail-closed contracts were rechecked. This completes the rollout scope. Organization ruleset enforcement and the provisioning scope choice remain separately tracked in melodic-software/github-iac#138. Closing as completed.
Activity
feat(runner-policy): register wave-3 runner-input contracts (#160)
ci: add dogfood do-not-merge and pr-issue-linkage gate callers (#133)
ci: route control-plane lanes through the governed selector (#237)
ci: add do-not-merge and pr-issue-linkage gate callers (#25)
ci: route control-plane lanes through the governed selector (#162)
ci: add do-not-merge and pr-issue-linkage gate callers (#71)
feat(select-runner): admit merge_group and same-repo pull_request_tar…
fix(standards-sync): satisfy pr-issue-linkage in generated sync PR bo…
kyle-sexton commentedon Jul 21, 2026
Verified live on 2026-07-21: all eight applicable
requires-cirepositories have the SHA-pinned shared PR-linkage caller on their default branch and each has emitted a successfulpr-issue-linkage / pr-issue-linkagecheck. Pins are PR #118’s merge SHA (f7e94a802...) or immutable forward descendants. Provisioning retains its explicitly permitted local.github/workflows/pr-body.ymlimplementation and has emitted a successful localpr-bodycheck. Trigger, check-name, and selector/fail-closed contracts were rechecked. This completes the rollout scope. Organization ruleset enforcement and the provisioning scope choice remain separately tracked in melodic-software/github-iac#138. Closing as completed.