Skip to content

Lane hardening after zero: egress, intake text, protected paths, local stop - part 5 of 7 #17727

Open

Description

@melodic-automation-lanes

Part 5 of 7 of #16967, split at intake (owner Q93). The done-when below is copied from #16967 as written.

Done when

  • Check whether the CI resolve-issue lane can reach a project's control skill (app-control) to drive the app.

Activity

  1. added
    needs-triage
    on Nov 21, 2026
  2. github-actions commented on Nov 21, 2026

    @github-actions
    Contributor

    Size: Small
    Complexity: Low
    Uncertainty: Knowable
    Flags: none
    Blocked by: none
    Blast radius: read-only investigation of whether the CI resolve-issue lane can reach a project's control skill (app-control); the result is a finding, read by maintainers of the lane.
    Reversible: yes; a check changes nothing, and any follow-up change would be its own revertible diff.
    Open questions: none
    I read this as part 5 of 7 of #16967, split at intake. The single done-when is to check whether the CI resolve-issue lane can reach a project's control skill (app-control) to drive the app. Reading the lane's workflow and skill-loading setup should settle it. The sibling parts (#17722, #17724, #17725, #17726, #17728, #17729) cover other items from the parent, so I did not treat them as duplicates.

    Automated triage. A maintainer reviews it.

  3. removed
    needs-triage
    on Nov 21, 2026
  4. melodic-automation-lanes commented on Nov 21, 2026

    @melodic-automation-lanes
    ContributorAuthor

    {"v":1,"actor_id":337595936,"title_sha256":"10c9e142f4a52c22ae3f4496c4a7248471dce0ee227d9249771a40df4702bc24","body_sha256":"2a3ed09c6ec8c2765cf8102043e7fd44c87b91e3d1dd44dd1b3ded3204459ec4"}

  5. melodic-automation-lanes commented on Nov 21, 2026

    @melodic-automation-lanes
    ContributorAuthor

    {"v":1,"actor_id":337595936,"title_sha256":"10c9e142f4a52c22ae3f4496c4a7248471dce0ee227d9249771a40df4702bc24","body_sha256":"2a3ed09c6ec8c2765cf8102043e7fd44c87b91e3d1dd44dd1b3ded3204459ec4"}

  6. added this to the After zero milestone on Nov 21, 2026
  7. added
    needs-human
    on Nov 21, 2026
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

No one assigned

    Labels

    needs-human

    Type

    Fields

    Work status

    agent-ready

    Priority

    medium

    Projects

    No projects

      Relationships

      None yet

      Development

      No branches or pull requests

      Issue actions