Skip to content

Map: AI adoption ladder — climb 2→3 (plugins fleet) #239

Closed
8 of 8 issues completed
Closed

Description

@kyle-sexton

Destination

A PLAN.md-ready contract set for climbing the fleet from step 2 to step 3 of Boris Cherny's adoption ladder (artifact, Jul 16 2026), plus a charter decision on the autonomous-runner repo. Graduates to: /planning:interview (Brief per work package) → /planning:architect. Build work graduates to /work-items, never onto this map.

Notes

  • Discovery + evidence: .work/ai-adoption-ladder/ — gap-map.md (synthesis), explore-plugins-inventory.md, RESEARCH-product-surface.md, RESEARCH-sandcastle-pocock.md, RESEARCH-headless-agents.md, RESEARCH-peer-frameworks.md, interview-checklist.md (Q1–Q4 resolved)
  • Fleet position: solid step 2; 1→2 essentially complete; gating weakness = autonomy of the loop
  • 1→2 residue (e2e in CI, pre-approved allowlist, review auto-invoke, classifier tuning) is build work → file via /work-items, not map items
  • wayfind-semantics question (Pocock census flag) is plugin hygiene, off this map → /work-items triage

Decisions-so-far

Pointer index only — each decision's durable home holds the text.

Not-yet-specified

Out-of-scope

  • 3→4 items until the 2→3 trust loop is earned (fuzzing, prod-feedback remediation, cross-repo migration engine)
  • Org-enablement collateral (deferred track above)
  • Vendor-hosted closed-loop (hosted agents keep a human-merge-gate by design; step 4 is self-operated)

Reference: Boris Cherny, "Steps of AI Adoption" (Google Doc)

Activity

  1. kyle-sexton commented on Jul 17, 2026

    @kyle-sexton
    MemberAuthor

    Destination coherent — all 8 decision items resolved and closed (#240 trigger layer, #241 security review, #242 routines, #243 guardrail matrix, #244 runner charter, #245 sandbox bar, #246 return accounting, #247 telemetry unification). Contract set recorded in the Decisions-so-far index (durable homes: each item's resolution comment + design-threads.md T1–T7). Handed to /planning:interview — Briefs per work package (packaging/topology and the deferred design-stage details land there) — then /planning:architect. Remaining Not-yet-specified fog lines carry into their tagged design/architect stages. Backlog seeds filed post-graduation via /work-items: telemetry native-vs-hook duplication audit (per #247), 1→2 residue items, wayfind-semantics reclaim, fleet dogfood build work.

  2. kyle-sexton commented on Jul 17, 2026

    @kyle-sexton
    MemberAuthor

    Source anchors (added for durability — the design threads re-anchor to this artifact):

  3. added
    wayfind: map
    and removed on Nov 13, 2026
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

No one assigned

    Labels

    wayfind: map

    Type

    No type

    Fields

    No fields configured for issues without a type.

    Projects

    No projects

      Milestone

      No milestone

      Relationships

      None yet

      Development

      No branches or pull requests

      Issue actions