You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
Refs #2933. Source: topic pocock-shipping-breakdown (PR backfilled when opened).
What to build
Adjudicate and (where accepted) land five upstream candidates in work-items:decompose and its references (evidence: topic memory slice upstream-bringover-audit.md):
C5 prefactor look-ahead at decomposition time ("make the change easy, then make the easy change"); prefactor tickets become blockers
C6 context-window slice sizing as a granularity calibration bar (each slice sized to one fresh context window) alongside S/M/L
C7 integration-branch fallback for wide refactors: when expand-contract batches can't land green alone, share an integration branch all blocking a final integrate-and-verify ticket
C8 "work the frontier" phrasing in the report step
Activity
docs(planning): Pocock Shipping-section absorption — interview contra…
docs(work-items): tighten decompose C5–C8,C17 phrasing and evals (#2935)
docs(work-items): mark integration-branch fallback as a separate work…
Merge origin/main into cursor/2935-decompose-deltas-68fa
Merge cursor/2935-decompose-deltas-68fa into lease-hardening
fix(work-items): mid-flight lease renew and contract honesty (#2979)