Skip to content

chore: redraft and post the replies to agentic-qe #528, #532 and #535 #398

Closed as not planned

Description

@pacphi

Why

The drafts promise work the redesign moved (ledger G14); each needs approval of its text.

In scope

Redraft the replies in the archived M1 execution plan (docs/archive/2026-09-30-plan-completion-m1-execution.md, "Exact upstream reply drafts") against the maintainer's 2026-09-29 comments, and record agentic-qe#786 and #787 (successors of #535) in the registry.

Out of scope

Unreleased upstream work.

Acceptance criteria

  • Outcome recorded in the upstream registry
  • Any upstream post was approved by the maintainer first

Dependencies

Blocked by: #385

Blocks: None

Plan

Verification

  • node scripts/upstream-watch.mjs report

Activity

  1. added this to the 4.1.0 milestone on Oct 1, 2026
  2. added
    v4.1.0Routing: v4.1.0 board
    size:SOne module plus tests; under a day
    on Oct 1, 2026
  3. pacphi commented on Oct 2, 2026

    @pacphi
    OwnerAuthor

    Closing as not planned, on the maintainer's decision of 2026-10-02.

    The plan was to redraft and post replies to agentic-qe #528, #532 and #535. All three threads are now closed upstream with the maintainers' own confirmation (#528 and #532 on 2026-09-29, #535 closed by agentic-qe #785 with the leftovers split into #786 and #787), so a further reply would add noise and nothing the maintainers need. The re-test evidence we posted on 2026-09-28 stays on those threads. #786 and #787 remain tracked under 4.1.0 work if they matter to us.


    Generated by Claude Code

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

No one assigned

    Labels

    size:SOne module plus tests; under a dayv4.1.0Routing: v4.1.0 boardws:upstreamUpstream integration and tracking

    Projects

    No projects

      Relationships

      None yet

      Development

      No branches or pull requests

      Issue actions