Plan: decision-safe context and resumable agent execution #1357

Open

Description

@unbraind

Outcome

Make project management = context management operationally testable: an agent receives the smallest authorized, current, evidence-complete working set, makes the right next decision, and resumes interrupted work without repeating effects.

This is a planning umbrella. No implementation or new defect reproduction is claimed. Public SDK primitives own semantics; CLI, MCP and package adapters stay thin.

Existing foundations to reuse

Delivery workstreams

  1. SDK: reconcile typed temporal knowledge and invalidate dependent context #1358 — Typed temporal knowledge reconciliation and dependency invalidation
  2. SDK: compile context with semantic coverage and coherent snapshot receipts #1361 — Cross-provider semantic context coverage and coherent read receipts
  3. SDK: resume execution checkpoints under fenced claim generations #1359 — Durable execution checkpoints with claim-generation fencing
  4. SDK: separate context identity, visibility and authority across selection and recovery #1360 — Separate knowledge identity, visibility and action authority; scope-before-ranking and effect-preserving recovery
  5. Eval: gate downstream decisions, abstention and task success per token #1362 — Decision-level scenario evaluation and success-per-token gates

Lightweight-default design constraint

All workstreams must follow #1363: keep the generic core lightweight, make advanced capabilities opt-in, and expose additional information through truthful progressive discovery. Required constraints, blockers, authority boundaries and insufficient-context outcomes must remain visible at the decision point. Git, coding, tests, claims and richer context/execution contracts must not become unconditional prerequisites for a simple task.

#1363 documents the capability-policy and migration plan, capability-aware guidance/help, and a six-task × two-approach × three-run total-agent-effort comparison extending #1362 and existing token accounting. Its reproduced baseline observations are distinguished from proposed implementation. The five children above remain planning work.

Implementation sequence

  1. Inventory the actual SDK exports, provider contracts and canonical PM owners at implementation time. Reuse existing owners for shipped/overlapping slices; only assign residual acceptance work.
  2. Agree versioned knowledge, coverage, checkpoint and policy contracts together. Names suggested in children are illustrative, not promised APIs.
  3. Implement pure deterministic SDK kernels, then storage/provider integration and thin CLI/MCP adapters. Capture dependency fingerprints before optimizing incremental reads.
  4. Define scenario fixtures and negative controls at the outset. Wire each workstream's executable acceptance into the existing eval/assurance pipeline.
  5. Verify packed Node/Bun SDK consumers and CLI/MCP parity; document migration, recovery and explicit consistency limits.

Cross-cutting acceptance

  • All five workstreams have named residual scope, linked existing ownership, tests and implementation documentation
  • Existing schemas remain readable; no silent promotion of old prose to verified truth, granted authority, or completed execution
  • Mandatory context omissions produce an explicit insufficient-context outcome; token savings cannot conceal lost decision evidence
  • Authorization precedes provider access/ranking; identity, visibility and action permission remain independent
  • Resume either verifies prior effects or returns an explicit unknown/blocked state; stale owners cannot commit after takeover
  • Decision correctness, abstention, effect safety, actual delivered token cost and latency are measured together
  • Existing quality/security/coverage/token ratchets remain intact; new gates include executable negative controls and non-vacuous denominators

Non-goals

No replacement project-management database, parallel session-budget ledger, separate retrieval harness, new identity provider, mandatory central server, automatic truth resolution from recency alone, or promise of exactly-once external effects.

Deduplication evidence

Reviewed open and closed GitHub issue/PR search results and public canonical PM records on 2026-09-30. Existing umbrella programs cover broad goals; these children are bounded implementation slices for the additional contracts and their acceptance evidence. If implementation-time inventory proves a slice already complete, attach exact evidence and narrow or close that slice rather than implementing it again.

Activity

  1. unbraind commented on Oct 2, 2026

    @unbraind
    OwnerAuthor

    Canonical PM owner: pm-gh1357. The item retains this report's full plan and acceptance, distinguishes the reported 2026.9.30 baseline from current verification, and links existing ownership with typed relationships. It remains open and unclaimed; implementation is queued behind the current security and linked-test delivery.

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

No one assigned

    Labels

    No labels
    No labels

    Projects

    No projects

      Milestone

      No milestone

      Relationships

      None yet

      Development

      No branches or pull requests

      Issue actions