Skip to content

Redeploy testnet with every Tranche 3 change #472

Open

Description

@hpmaxi

Priority

Medium

User story / Problem statement

Currently, the testnet deployment dates from 2026-10-22, before Tranche 3. Since then the vault, the oracle and the compliance contract have changed (#458–#461), and open work changes them again: the verifier event (#441), the 14-decimal price scale (#431) and the identity registry and compliance that replace the stubs (#238). Stored reports and epoch prices on the current deployment are in WAD, so it cannot be upgraded in place. A redeploy after each change would mean several rounds of new addresses for the app and the docs.

Expected outcome

One testnet deployment built from tranche-3 once this work lands, with the README, the app and the SEP-1 example pointing at it, and nothing left that names the old one.

Acceptance criteria

Technical notes

The previous redeploy changed environments.toml and the README in one commit (4e41533). The app reads contract ids from environments.toml at build time, so its build follows that file.

Activity

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

No one assigned

    Labels

    Type

    No type

    Projects

    No projects

      Milestone

      No milestone

      Relationships

      None yet

      Development

      No branches or pull requests

      Issue actions