Repository navigation
fix(ci): raise jvm-tests job timeout 15m -> 25m - #680
libravault-pipeline-bot[bot] wants to merge 2 commits into
Conversation
QA verification — PR #680 vs issue #679Issue type: bug report (CI job timeout too tight), no acceptance checklist — checklist here is "repro no longer reproduces + regression test if applicable."
One documentation-only note (not a blocker): the PR body correctly points out the issue's claim that the fix was "applied directly on PR #672" doesn't hold — PR #672's branch has no such change. The PR author verified this and applied the fix against QA verdict: PASS |
There was a problem hiding this comment.
Principal review — verdict: human-merge
Risk classification
risk:high is correctly applied and current: the diff touches .github/workflows/jvm-tests.yml, which matches the .github/workflows/** entry in agent-policy.yml's sensitive_paths, and no commits landed after the label was last set (label applied 20:42:07Z, last commit 20:35:41Z). Verified with classify_pr_risk.py's own logic by hand — no need to re-run it, the label is trustworthy. This alone forces human-merge regardless of anything else below.
Diff correctness
The change itself is exactly what it claims: .github/workflows/jvm-tests.yml's test job timeout-minutes: 15 -> 25, nothing else. Confirmed against the live file and git log origin/dev..origin/fix/jvm-tests-timeout-679 --stat (one real commit, one no-op retrigger commit). No new networking, no other sensitive path touched, no test required — "build-script bumps" are explicitly exempt per AGENTS.md line 14-15. PR #680's own CI run shows Unit & Integration Tests (JVM) passing in 5m29s, well under both the old and new timeout — consistent with the PR's own cache-cold theory (this run didn't reproduce the slow lint scenario, which is expected).
I also independently verified the underlying claim about PR #672's original CI run: run 33007398055's Unit & Integration Tests (JVM) job did complete as cancelled, consistent with hitting the 15-minute timeout as described.
Finding: this PR is now a duplicate of already in-flight PR #672 — filed as #681
The PR body states, correctly at the time it was checked, that PR #672's branch (fix/agp-8.13-r8-kotlin-metadata-582) contained no fix for this timeout, so this PR applies the fix directly to dev instead. That's no longer true: PR #672 received its own identical fix (commit a712c51, "fix(ci): bump jvm-tests job timeout 15min -> 25min (#679)", authored 2026-08-26T20:32:13Z) roughly 30 seconds before this PR's own fix commit (e903493, 20:32:43Z). PR #672 is currently OPEN, MERGEABLE, and already at status:needs-human-merge — i.e. it already independently passed through this same review pipeline with the same fix (plus a fuller explanatory comment) attached.
Concretely, right now there are two open, risk:high, human-merge-gated PRs making the identical timeout-minutes: 15 -> 25 edit to the same line of the same file. Whichever merges first turns the other into a conflicting hunk on that line (bare 25 vs 25 + comment) rather than a clean merge, and leaves the second PR as pure redundant work. This isn't a defect in the one-line change itself, but it's real information a human merge decision needs: recommend closing this PR in favor of #672 (or coordinating which one lands), rather than merging both.
I filed this as #681 for a permanent record, since it's a verified pipeline-coordination gap (dev-agent had no way to detect a same-second landing on another PR) independent of whether a human ultimately closes #680 or merges it anyway.
Outcome
risk:high (sensitive path) already mandates human-merge on its own. Combined with the duplicate-PR finding above, a human should look at this alongside #672 before merging either — requesting changes here rather than a bare routing comment so that context isn't missed.
|
Closing as superseded by #672 (already merged to dev), which raised |
Summary
jvm-tests.yml'sUnit & Integration Tests (JVM)job (test) hadtimeout-minutes: 15, withRun Lintas its last step. On PR #672 (the AGP 8.9.1->8.13.2 / Gradle 8.11.1->8.13 bump for #582), the job hit the 15-minute job-level timeout and was killed mid-lintAnalyzeDebug—Run JVM testsalone had taken ~12m38s, most likely a one-time cold-cache tax from the new Gradle wrapper distribution plus AGP invalidating cached lint models, not a real regression (steadily progressing when killed).Verified directly against PR #672's actual CI run (run 33007398055):
Unit & Integration Tests (JVM)showscancelledat 15m26s — matching the timeout described in #679.Note: issue #679 stated the fix was "applied directly on PR #672," but that PR's branch (
fix/agp-8.13-r8-kotlin-metadata-582) contains no such change —git diff origin/dev origin/fix/agp-8.13-r8-kotlin-metadata-582 -- .github/workflows/jvm-tests.ymlis empty, and none of its 3 commits touch this file. So the fix never actually landed anywhere; this PR applies it againstdevdirectly instead.Change
timeout-minutes: 15->25for thetestjob in.github/workflows/jvm-tests.yml. Gives real headroom regardless of whether the slowdown was cache-cold (should self-resolve oncedev's cache is warm) or a genuine AGP 8.13 lint slowdown (worth a closer look if it recurs after cache should be warm, per the issue).Risk
Touches
.github/workflows/**, which is asensitive_pathsentry inagent-policy.yml—classify_pr_risk.pywill forcerisk:highon this diff regardless of size, so it always lands onstatus:needs-human-merge. Flagging explicitly per dev-agent policy. The change itself is a single-line timeout bump with no behavioural change to what runs.Trivial build-script bump — no unit tests needed per AGENTS.md's exemption list.
Closes #679