--fail-fast: cancelled tests are not reported, and a failure can appear twice as an "Unhandled exception" node #7119
Two reporting problems remain on --fail-fast runs after #7115.
Extra "Unhandled exception" test node. When fail-fast stops two scheduling phases that run concurrently, the first failure is reported a second time as an extra "Unhandled exception" test node.
Cancelled tests are not reported. Tests that fail-fast cancels before they start get no result node. A run can show total: 1 even though many tests were selected.
Repro
Problem 2:TUnit.TestProject --treenode-filter /*/*/KeyedNotInParallelFailFast7074/* --fail-fast --maximum-parallel-tests 1 reports only the failing test. The Waits tests that were cancelled while waiting for their slot do not appear.
Problem 1: needs fail-fast to trigger while two phases are running (for example, parallel and keyed tests at the same time).
Notes
Both predate #7084 and #7115; found while fixing the fail-fast host crash in #7115. Expected behaviour is likely that cancelled tests are reported as skipped or cancelled, and that each failure is reported exactly once.
Related symptom found while investigating a CI timeout (see #7125). When the session is cancelled (for example by --timeout), the global [NotInParallel] phase logs every remaining queued test as "Unhandled exception in test …" with a TaskCanceledException from NotInParallelLock.EnterExclusiveAsync. That made a plain timeout look like a lock deadlock. Reporting those tests as cancelled, or stopping the loop once the session token is cancelled, would fix both this and the fail-fast reporting gap above. Coordinate with #7115, which also changes TestScheduler.
Activity
thomhurst commentedon Oct 18, 2026
Related symptom found while investigating a CI timeout (see #7125). When the session is cancelled (for example by
--timeout), the global[NotInParallel]phase logs every remaining queued test as "Unhandled exception in test …" with aTaskCanceledExceptionfromNotInParallelLock.EnterExclusiveAsync. That made a plain timeout look like a lock deadlock. Reporting those tests as cancelled, or stopping the loop once the session token is cancelled, would fix both this and the fail-fast reporting gap above. Coordinate with #7115, which also changesTestScheduler.fix(engine): report every test once on fail-fast runs (thomhurst#7145)